Bridge construction limits river shipping through Belgrade
2026-03-09 - 11:27
Shipping on the Sava river through Belgrade is being restricted for the construction of a new bridge to replace the historic bridge that was torn down
Share this post:
2026-03-09 - 11:27
Shipping on the Sava river through Belgrade is being restricted for the construction of a new bridge to replace the historic bridge that was torn down